Where we r using split range and ratio controller?

Answer Posted / sivaram

To maintain the PV out put related with two different process
then out put should be split Ex:-Steam turbine Hot well level
control 1) PV: Hot well level 2)split out put1:inc to dec
action 3)Split out put2:Inc to Inc action ,and valves also
designed reverse action.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we use impulse line of flow transmitter at 45 deg. angle both side of orifice plate.

1940


Displace type LT to be calibrated in workshop, wt. 40, dia- 60 mm, density- 0.8kg/cm3.

1441


can you provide me full detail about instrumentation in ONGC??

1753


Calibration of controller (pneumatic)

1518


i have done DAE in Instrumentation and Process Control. i have applied for an apprentice training in chemical company after three day my interview will be conduct but i need more information about industrial process control and controller. my e mail is imran_dilsetu@yahoo.com please tell me interview question relative to instrumentation ?

1876






How many interlocks at turbine? Plz explain briefly

1527


Somebody tell me in what way i need to prepare for csio pgrpe(adv instrum eng)interview?what all the quest can i expect?

2111


Why ac supply load cell is used? Can we use the dc supply load cell?

603


Please asked me How calculate DCS controller memory.

2344


what is KV and XV valve

1290


1.what is controller proportional gain 2.what is the controller intergral action time. 3.A proportional plus derivative controller that has a proportional band of 20% and a derivative action time of 0.1 minutes. Construct the shape of the output waveform for the triangular input if the input rises and falls at the rate of 4 units per minute.

2223


hi! i want to know about mpse exam.

1790


what is exact time to study dcs and plc cources

1563


the pump holds on run indication into the dcs and filed local control panel remote push button condition operaton wrong like when the push button pushing conditions the pump is off and the push button release condition the pump is on totally opposite condition . And control room inside give the stop command into dcs just 1secon relay engage and again normal condition. How can I slove

1134


why is not useing in boiler skin thermocople

4539