Answer Posted / barath
separate the series in to 2 parts ..ie
3,13,33
then 2nd sequence will be
6,26,66
the diff btwn no.s in the 1st sequence is 10,20, and so on
diff in 2nd sequence is 20,40, and so on
next no. will be 33+30=63
ans is 63
Is This Answer Correct ? | 16 Yes | 12 No |
Post New Answer View All Answers
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
What is alternate bid?
how to find out hard strata in bored pile when the DMC method adopted.
Formula of mid span bar
Does VDF add strength to the flooring apart from preventing water ingress?
What are advancements in civil engineering?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
where can i get the previous question papers for rrb section enginerr (civil)
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What is the meaning of soil reinforcement?
What Reinforcements Are Used In The Process Of Prestressing?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
In block work seawalls what is the purpose of slip joints?