How to calculate Battery back up time for a 400 AH Battery
bank having a load of 20 Amps and charging time required to
fully charge this battery bank?

Answer Posted / abhishek goyal

We need information about voltage level or range.
if voltage is high so that current is less in other
condition it will reverse.

We can calculate if know about the voltage , current and
load etc.
P=VI (KVA)

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Where is servomechanism used?

665


Earth leakage relay basic knowledge principle

1743


Any one who apply for Ferro Scrap Nigam Limited cn join with me at rajuhalder@indiatimes.com or 09669717028

1589


Difference between low impedance and high impedance Restricted Earth Fault

2634


# 4 hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible my email id is sumit_lig189@yahoo.co.in

1577






i am studying in final year can i allowed for 23rd UES of Indian army

1662


in what type of applications v can use q meter?

1673


Define average demand?

911


how to calculate single phase motor efficiency ?

1523


What is inverse definite minimum time lag relay? Where is it use?

2301


A 10 MVA, 66KV, 50Hz, Y-connected 3-phase alternator has synchronous reactance of 0.635 Ù. It is working at full load at 0.8 lagging p.f. condition. Find torque angle, neglect armature resistance.

2088


The power factor of the fixed load is 0.8, now the p.f is varying from 0.8 to 0.5.

1582


In PFI plant one stage capacitor connection is directly connected(with out megnetic contact controll). but why?

1890


working principles of cf lamp,incandescentlamp and f lamp?

1845


how to design step down 12 V, 1mA small transformer from 220 V AC? Because according to VI relation and power transfer it results bulky...

1681