How to calculate Battery back up time for a 400 AH Battery
bank having a load of 20 Amps and charging time required to
fully charge this battery bank?
Answer Posted / abhishek goyal
We need information about voltage level or range.
if voltage is high so that current is less in other
condition it will reverse.
We can calculate if know about the voltage , current and
load etc.
P=VI (KVA)
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
Where is servomechanism used?
Earth leakage relay basic knowledge principle
Any one who apply for Ferro Scrap Nigam Limited cn join with me at rajuhalder@indiatimes.com or 09669717028
Difference between low impedance and high impedance Restricted Earth Fault
# 4 hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible my email id is sumit_lig189@yahoo.co.in
i am studying in final year can i allowed for 23rd UES of Indian army
in what type of applications v can use q meter?
Define average demand?
how to calculate single phase motor efficiency ?
What is inverse definite minimum time lag relay? Where is it use?
A 10 MVA, 66KV, 50Hz, Y-connected 3-phase alternator has synchronous reactance of 0.635 Ù. It is working at full load at 0.8 lagging p.f. condition. Find torque angle, neglect armature resistance.
The power factor of the fixed load is 0.8, now the p.f is varying from 0.8 to 0.5.
In PFI plant one stage capacitor connection is directly connected(with out megnetic contact controll). but why?
working principles of cf lamp,incandescentlamp and f lamp?
how to design step down 12 V, 1mA small transformer from 220 V AC? Because according to VI relation and power transfer it results bulky...