how can we calculate the amount of concrete in trapezoidal
footing?
Answer Posted / prashant verma
if A is length and B is breath and H is total height of trapezoidal footing and a' and b' is size of column n h is trapezoidal portion height.
then total qty of concrete is=A*B*(H-h)+[{h/3{a^2+b^2+(ab)^1/2}]
where a=A*B
b=a'*b'
Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
types of survey and levelling instrument ?
What you understand by richter scale?
Define What is a projection line?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
What is the ideal size of the living room ranges from small to large size?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
how many spacers we need for 1 ton reinforcement? aprox.
Define polar co ordinates.