9*9 1:4:8 ratio using how to calculate the material for
40mm aggregate ,cement &sand please tell me answer
Answer Posted / sravan875
1:4:8 Ratio means 1%cement,4%aggregate,8%sand.
cement percentage--1/13=0.0769231cum.
aggregate %---4*0.0769...=0.3076924cum.
Sand % ----8*0.0169...=0.6153848cum..
Cement=0.0769*2370kg/cum (unit weight of concrete)=182.30775kg
40mm Aggregate=(density 1950kg/cum).
aggregate needed=0.3076924*1950=600.00kg of aggregate
Sand density(dry,packed)---1600-1900kg/cum
sand(dry,packed)-0.6153848*1750=1076.9234 Kg of sand is required.
Cement=182.3 Kgs
Aggregate=600Kgs
Sand=1077 Kgs
Is This Answer Correct ? | 3 Yes | 18 No |
Post New Answer View All Answers
Define polar co ordinates.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How to calculate brick work quantity?? Block work quantity??
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
what is right & short method of measurement of slab&beam
Differentiate orthographic and isometric projections?
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
how many litres of enamel paint required for 5000 sft of site??
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
can you give me the details of rate analysis of steel and concrete?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??