Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What type of pipe material G.I or M.S is used for sprinkler
system?

Answer Posted / parvesh sharma

C class M.S pipes are mostly used in the sprinkler line because of welding work can easily be carried out on it.

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Installation method of self treated earth electrode.

2065


what is auto re-closer?

2648


what is the differences between microprocessor and general purpose computer

2203


Vibromotor 252MV 1/4HP2P..what is mean by 252MV?

1965


can I improve the furnace power factor (10 mva transformer) by adding a capacitor bank before the transformer.Does system power factor vary a lot with the furnace PF?

2059


How to calculate KVA/VA rating of PT or CT from primary & secondary voltage or primary & secondary current?

2436


at work we have a 3 phase motor but on testing one phase isnt getting a reading. it runs 24 hours a day all week. stops and starts well no noise or heating. the phase isnt down to earth.is it just a bad meter reading or not? phases one and three came up with a resistance reading of 0.4 but phase 2 couldnt get anything shows up as open circuit.

1677


Is electro plating what type of load whether resistive, inductive or capacitive loads

3331


what is the circutor?why we use it ?

2364


what is mind in cable

2075


Testing report of Earthing of 3.15 MVa PTR.

2588


how can calculate 1kva generator running time in 1 liter keroscene

2625


How the capacitance og capacitor volatage transformer is decided?

1976


What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.

1989


can the measured percentage error during calibration of single phase energy meter be negative?

2422