How much overlapping required for welding the reinforcement
bars in Columns & beams
Answer Posted / vijay kumar
Overlap length of reinforcement by wielding is 15d i.e 15 times the diameter of bar. Wielding will be carried out for Top 5d and bottom 5d. i.e there will be a gap of 5d in between.
Is This Answer Correct ? | 15 Yes | 11 No |
Post New Answer View All Answers
Why joints are provided?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
How do we determine the specific gravity of a cement?
how to design and calculate materail quantity for concrete speedbreaker ?
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
What is the difference between yeild strength and compressive strength of steel???
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
Wat is meant by Aecron brick?
Cement consumption of one cubic meter of aerocon blocks masonry?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
Explain what is zoning permit?