How much overlapping required for welding the reinforcement
bars in Columns & beams

Answer Posted / vijay kumar

Overlap length of reinforcement by wielding is 15d i.e 15 times the diameter of bar. Wielding will be carried out for Top 5d and bottom 5d. i.e there will be a gap of 5d in between.

Is This Answer Correct ?    15 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why joints are provided?

677


How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently

2061


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1806


How do we determine the specific gravity of a cement?

651


how to design and calculate materail quantity for concrete speedbreaker ?

5377






weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

4575


What is the difference between yeild strength and compressive strength of steel???

1786


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1351


Wat is meant by Aecron brick?

1649


Cement consumption of one cubic meter of aerocon blocks masonry?

3669


what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?

1151


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2053


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1092


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1463


Explain what is zoning permit?

767