Answer Posted / arvind rai
Read,study ,evaluation and modification
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
Define the various stages of the project planning process in construction.
Explain the various stages of the project planning process in construction?
Describe a time when you anticipated potential problems and developed Preventive measures
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
how to calculate the concrete mix m30 by volume
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
What is passive earth pressure ?
How to do rate analysis for concrete work including shuttering work?
what is differences between ferrock and concrete ?