Answer Posted / anand kumar singh
SIMPLY YOU CAN SAY -RESTORING MOMENT IS CALLED BENDING MOMENT OR
AT THE CROSS SECTION OF BEAM ALGEBRIC SUM OF MOMENT OF FORCES ON RIGHT OR LEFT SIDE OF THE SECTION IT MAYE BE sanging or hogging
SHEAR FORCE:sum of the all unbalanced vertical forces to the right or left of section acting at the cross section of beam is called sher force.
Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
How much cement will require for 1Rmt Skirting laying
how much shouid be the rate for ready mix concrete per cubic meter
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
1:4:8 pcc calculation 591 cu.ft
How many days should curing of plastering, brick work and concrete
What is GSB gradation
Can we use the flyash bricks in brick bat coba?
how to check and keep control on the wastage of material at site
Does VDF add strength to the flooring apart from preventing water ingress?
What is made from large rocks, which protects the base of cliffs?
how to find ssm in foundation?