What are the test involved in DG auto synchronizing panel
before in manufacturing place before dispatch.

Answer Posted / engineered

DG auto synchronising panel are equiped with Numerical
series relays,
At manufacturing facility grid power is used for
synchronisation purpose.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if there is nutral in phase why we use earthing wire and grounding? even at fault condition the fault current flows to neutral (it is a lower path)

1333


Is potential difference materials property ..? if yes tnen how.. explain brifly.

1534


Why High voltage are generate noise ?

955


Which of the following alternatives will be cheaper (1) A 100 h.p AC, 3-phase motor (2) Four motors of 25 h.p each (3) Five motors of 20 h.p each (4) 10 motors of 10 h.p each explain

2516


WHAT IS THE WORKING PRINCIPLE OF A GENERATER.how is a GTG (Gas TURBANE Generater) working.plz explane

2058






ult of expression 'document.FrmQF.myem

1656


We have two parts in generator, electrical & mechanical. how it works?

1504


when 20hp 3 phase motor start no load condition in star or delta connection.find current and write formula.(tariq)

1526


volts=230 c=10mf a=??

1575


Difference between On Line capacitor and Station Type capacitor.

1617


explain different losses in a transformer.

649


what are the factors to be considered while design the breaker either HT or LT??

1405


what happens when series resonance occurs?

1388


How to calculate no of Lighning arrestors are required for protecting 50mX 50m*20m cubical building and locations of LA?

1445


Approach of a cooling tower is the difference between temperatures of what factors?

617