What are the test involved in DG auto synchronizing panel
before in manufacturing place before dispatch.
Answer Posted / engineered
DG auto synchronising panel are equiped with Numerical
series relays,
At manufacturing facility grid power is used for
synchronisation purpose.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
if there is nutral in phase why we use earthing wire and grounding? even at fault condition the fault current flows to neutral (it is a lower path)
Is potential difference materials property ..? if yes tnen how.. explain brifly.
Why High voltage are generate noise ?
Which of the following alternatives will be cheaper (1) A 100 h.p AC, 3-phase motor (2) Four motors of 25 h.p each (3) Five motors of 20 h.p each (4) 10 motors of 10 h.p each explain
WHAT IS THE WORKING PRINCIPLE OF A GENERATER.how is a GTG (Gas TURBANE Generater) working.plz explane
ult of expression 'document.FrmQF.myem
We have two parts in generator, electrical & mechanical. how it works?
when 20hp 3 phase motor start no load condition in star or delta connection.find current and write formula.(tariq)
volts=230 c=10mf a=??
Difference between On Line capacitor and Station Type capacitor.
explain different losses in a transformer.
what are the factors to be considered while design the breaker either HT or LT??
what happens when series resonance occurs?
How to calculate no of Lighning arrestors are required for protecting 50mX 50m*20m cubical building and locations of LA?
Approach of a cooling tower is the difference between temperatures of what factors?