why the 4 terminal are named as main, line, common, voltage
(M, L, C, v) of a wattmeter??
why not its nameed as A,B,C,D??
Answer Posted / laksh619
Because of connection identification the terminals are named as L,M,C and V.
Is This Answer Correct ? | 7 Yes | 23 No |
Post New Answer View All Answers
how to set relay setting? and example calculation...
How to calculate the size of earth cable to earth the neutral of UPS ?
How servo stabilizer works.
What is the direction of current flow in ct secondary...means if the current is flowing from P1 to P2 then what will be the direction of current flow in ct secondaryw
if any house we instaled a 1.5 ton ac and its phase cable of wiring is installed but netrual cable of wiring not instaed. my question is that is neutual of house(for other wiring is capable for ac load or a sepeart neutrual wiring required
single phase power supply give to separate one steel coup with water, what reaction create
what kind of quetions will ask in BHEL in interview? Plz help me?
before transformer oil dielectric strenght tests are taken the oil should be allowed to settle to remove option 1 air bubbles 2 gasses 3 contamination 4 water
As we know induction squirrel cage motor torque Directly praprortinal to applied voltage in star connection & delta also. If I connect 55KW Motor to DOL starter in load condition does motor withstand the load & what will be the current withdrawn ? motor will not fail ?
What are the advantages of autotransformer?
Any one can explaination about calibration with rotating sub standards?
why magnetising curve not start with zero voltage?
how do i commission a distribution transformer knowing all its ratings and transformation ratios?d
EXPLAIN USE OF ROCKING ARRANGEMENT IN ELECTRIC HEATING?
in a solar power plant,we are going to step up the voltage 350V to 33kv, and to 132kv GSS. i want to ask that if it is possible that 315v/33kv is not possible because we also use 315v/11kv. or it should be 415v/33kv? is it effects generation or losses? the second question is-generation is depends on LV winding? or LV winding design for generation voltage?