what is the density of steel

Answer Posted / sunkara.sathish

density of steel=78.5kn/m3

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Joule Brayton Cycle?

772


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1647


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2368


the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none

1691


How to estabilish reinforcement Steel rolling margin for a building projects ?

3650






What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster

1852


How to build the floor to ceiling bookcase?

827


how to take concrete quantity for precast segment for viaduct project?

2580


What is demising walls?

691


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

4870


In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?

1611


How is make concrete cube?

706


What is the general specifications of a bituminous pavement road?

1237


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3331


A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

1357