Answer Posted / manan bhatt
it is HIgh POTential test which is generally done on power
transformers to check their capacity in various electrical
terms.
Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
what is the effect of un-synchronized power.
hi can anyone pls tell me the eee interview core questions asked in l&t
Please tell me the earthing procedures adopted for the STAR-STAR 3 Phase transformer in india and give a better sugession for earthing
Why derivative controller is not used in control systems?
various transmission tower like .,D tower ,K.C.O tower ,C.C.O tower,K.C.R tower ,C.C.R tower ,H.C.O tower in different tons.
where solid grounding and where grounding through ngr done and why?
why do we put a transformer on soak before loading it
Do u know any one? how to find out in motor rated amps? formula?
What happens if we give the supply to the rotor of induction motor and make its terminal shorted?
ROC converges if poles and zeros lie inside a. Origion b. Z=1
What is process of anneling transformer core
Type of motor stater detail and working detail
What is the necessary and sufficient condition for stability.
Difference between transition and diffusion capacitance
Why does the adjacent zone of protection overlap?