how we can design the design mix(m25)

Answer Posted / reddy

m25 mixdesign-1:1:2

Is This Answer Correct ?    13 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Civil engineering related

1509


Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam

5123


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

1803


For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?

1775


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

2772






what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

968


can stub column take the load as main column

1415


what is the percentage of silt in black cotton soil.?

1953


Use of coping on terrace wall and in 4" wall is compulsory or not ?

1098


1:4:8 pcc calculation 591 cu.ft

1798


how much repeitation for conventional and maivan formwork?

1581


how to calculate the material from ratio of work PCC, RRM,POINTING, RCC

1884


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

1797


Why should you show Client/Engineer activities clearly on the project plan?

1955


Advantage of Aluminum form work in terms of activities can be skip and cost too

561