Difference between P.C.C and R.C.C?
Answer Posted / vikram singh,(abe), lasa,belga
The concrete for which there is no use of steel or steel used is less in quantity than required for RCC is termed as PCC. But in case of RCC least amount of steel(as per desin) is essential. In PCC used reinforcement is skin reinforcement to avoid shrinkage cracking.But in RCC the reinforcement is provided to resist stress. Reference:---- IRC 21-2000.
| Is This Answer Correct ? | 71 Yes | 13 No |
Post New Answer View All Answers
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
What is the substitute of Mastic Asphalt?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
silt%= silt volume/ silt+sand volume is this right?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
What is the maximum strength of cub compress strength in one cub testing
Forces in a Shear Wall are in plane or out of plane ?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
in 100 cft = 1350 bricks in 100 cft = ? bloks
what is the coefficient for running feet to cft coversion both area and price
how we calculate the vol.of wet concrete..?
What is reinforced concrete?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.