how to calculate the runner (2*3) qty in cft. the length is 8 feet.
Answer Posted / prabin chandra
(2*3/144)x length 8 feet
Is This Answer Correct ? | 40 Yes | 18 No |
Post New Answer View All Answers
Define What is Civil Engineering?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
How to calculate Volume of Wet cement concrete for a specific grade?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
what is the Asfalt test?in road constraction..?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
Why the finite element method is lower bound solution?
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
How to calculate paint drums per meter square
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
Formula of mid span bar
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What is the significance of cost estimate knowledge for an architect?