Answer Posted / tango
In any engineering , at ground level we do grouting, we have two options either the grouting to be finished upto ground level or if we go for raised grouting in that case we go for step foundation.
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is the l/d ratio of cantilever beam?
silt%= silt volume/ silt+sand volume is this right?
What ingredients with% found in ppc cement??
What is diversion tunnel in a dam?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
Explain major difference between auto level and dumpy level?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Explain what is the difference between built area and super built up area?
Why is concrete cube test carried out?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
what is diffrence between catchment area,watershed and basin?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
Will going from a 3-tap to 6-tap increase water pressure?