Answer Posted / sjtbehera
go for own mind. any thumb rule not provided
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
In the roof of a pumping station explain briefly the components of a waterproofing system?
how many material required for brickbat water proofing of toilets.
why do we not deduct volume of steel to find actual volume of concrete in practical???
how statics is different from dynamics
What is type failure of road surface? how to repair the failure of road surface?
How to testing voids of filled aggregate in bitumen mix design
Difference between pre-tensioning and post-tensioning.
how much area can be platered by a mason for exterior
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
How is improve my knowledge in construction industries....
how to caliculate required amount of cement and sand required for 1cu.m.
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
what is the dimensions of river sand truck trailer or trolly ?
which formula used for calculate the area of segmental arch?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?