what is the requierd compressive strenth for m 20 grade concreat for
7 days?
Answer Posted / ashish sharma
its about 65% of 28 days compressive strength of concrete.
So for 7 days its about 13n/mm2.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how to calculate the strength of rebound hammer test reading in building construction ?
The mixture of different ingredients of cement is burnt at?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
How many types of slabs are there & how to design it?
Which percentage of carpet area use in plot area of office building.
Would you cause a 55-gallon drum of water to weigh more by climbing in?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
How much does the leaning tower of pisa lean?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
how i convert mm into standard wire guage (SWG)no.