High Voltage out door substation-annual maintenance, things
to be considered
Answer Posted / a.p.nanjappa
1) BOLT CONNECTION ALL EQUIMENTS CHECKING.
2) MAIN EARTH CONNECTION.
3) eARTH SHIELD, fiber optic cable connections.
4) Test the CB TIMING ,INSULATION, PROTECTION RELAYS,
ct,VT, - OIL TESTS, DS,ES,
5)hvac
6) DC system
7) Outdoor lighting/emergency change over.
8) On line sub stn cleaning eauipment
9) funtional test for Bus bar differenctial protection and
its logic sequence restoration of sub stn equipment. if any)
in case of one and half CB sub-station configuration.
10) fire fighting system.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the maintaining Cf in UPS.
What should be setting for alarm,tripping and cooling fan on for power transformer's oil temp. and winding temp. indicator?
A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES 300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE
sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company
mccb service sittings be done?
How is operate breaker failure scheme in substation
how to calculate the loss tangent of electrical cables
Define active filter?
In ups static switch if i gives the supply at output end it will open the circuit in stactic switch or not if it will open then how it operates.
What is an iron loss or core loss pi?
is it possible to start a motor in felid connected to a remote mcc
how you taken aotitude test
What is Scheme Test of High Voltage Switchgear. Which tests it includes.
what is inverter and converter
What is inductance?