Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

If not maintained 3 phase clearance,what happened ?

Answer Posted / shri..

it will bet short if clearence is less

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A 3-PHASE TRANSFORMER IS USED TO STEP-DOWN THE VOLTAGE OF A 3-PHASE, 11KV FEEDER LINE. PER-PHASE TURNS RATIO IS 12.FOR A PRIMARY LINE CURRENT OF 20A, CALCULATE THE SECOUNDRY LINE VOLTAGE, LINE CURRENT AND OUTPUT KVA FOR FOLLOWING.A)STAR- DELTA.B)DELTA-DELTA.

3065


what is self capacitance of inductor

2438


if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit

1882


mention hazard experienced during installation

1985


What the formula for calculating no.of earthings & size of earth strip for 100mX90m shop.

2367


How to decide no. of Step and Kvar for APFC Panel 40 kvar MD: 33.12 KVA Avg pf : 0.8540

1107


if any house we instaled a 1.5 ton ac and its phase cable of wiring is installed but netrual cable of wiring not instaed. my question is that is neutual of house(for other wiring is capable for ac load or a sepeart neutrual wiring required

2480


why power factor is important?

10400


I have iti elec, 1st aid, and 5 yrs experience in 7.5 mw power plant. Am i eligeble for 11kv license in telangana state..when, how to apply for that.?

2317


What is the automatic voltage regulator with servomotor?

2047


hi, could someone help me to find a control design for syncronising panel .

1735


what is the difference between earthing and unearth

3110


After completing iti in electrician, how can i get certificate of electrical supervisor? What ia requirements. For it?

1833


can anyone give an idea about dia calculation in cold rolling mill

1687


how does high earth to neutral voltage affect electronic equipment?

1564