Area of 8mm dia bar = 50.28 sqmm .
Area of 10mm dia bar= 78.57 sqmm .
For example if you don't have 8mm dia bar available to use
in 1m strip of slab,then one can use 10mm dia bar with an
increased spacing relative to 8mm dia bar.And reqired area
of steel in 1m wide strip is 452 sqmm/m length (Ast/m
length). the calculation is as follows
Using 8mm dia bar we get spacing in 1m wide strip as
s=[(b*Abar)/Ast] therefore s=[(1000*50.28)/452]. Therefore
required spacing with 8mm dia bars= 111 mm c/c.
similarly the required spacing using 10mm dia bars will be
spacing = [(1000*78.57)/452]. Therefore required spacing
using 10mm dia bars = 173mm c/c in 1m wide strip length.
Is This Answer Correct ? | 63 Yes | 9 No |
Post New Answer View All Answers
(Project Management Topic) What are the important criteria in the successful realization of the project?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
is concealed wiring a problem in fly ash brick wall?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
Civil engineering material testing Standard results
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
Why should you show Client/Engineer activities clearly on the project plan?
Concrete cover for slab, column, beam and footing?
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
Why do you want to work here
what is the relation between pitch of steel and depth of slab?
What is the tallest man made structure in the world?