Answer Posted / sivasubramanian
It is a procedure used to determine the optimum amount of ingredients to prepare a concrete which also satisfies both work ability and strength criteria.
Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
what is pqc
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
how to convert sand in Cft to Kgs
what is the exact dia of 8swg and 10swg gabion wire
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
How does siphoning work?
What is .Dwg?
What is fineness modulus ? and its sieve # ?
For Wet Mix Mecadam design what is Optimum moisture content
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
What is the difference between undo & redo?
why do we provide haunches in rcc box or underpasses?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
what is the criteria for the finalisation of pavement thickness in road project?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream