Answer Posted / deepak
A Resource is anything required to perform, schedule or
cost an operation for example an employee or machine.
A resource and usage rate for all scheduled activities is
required in a routing. Scheduled resources can include
queue, setup, run, and move time.
Different types of resource can be created to reflect the
actual staging or manufacturing resource being planned.
A resource type can be a person (e.g. technician,
specialist, etc.), a machine or physical space.
Other types are available (amount, currency, miscellaneous)
but only the prior ones will be used at this point .