Answer Posted / arvind rai
Actually, the concrete material depens on their ratio or proportion.without this we can not find out how many materials are required in 1cum concrete.
Hence ration is required.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
1m square 20mm plastering how much of water need curing work
what values & beliefs have guided you in your career path
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
What are the advantages of cad software’s?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
what is pqc
what is the use of water bar in water tank and is this an extra item in estimate?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
how to calculate mivan shuttering matrial
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
How do You Maintain a structure after getting cube test of low strength.
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
how to calculate rate analysys of 1:6 plastering 10 sq m
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.