In two way slab where should we stop the work at end of the day?
Answer Posted / ajay kulkarni
it should be a little ahead towerds center form point of
contraflexure to allow for bonding roughfly @ L/3 from
either ends for two way slab.
Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
calculate the quantity of water for 1:6 cement mortar
What are the different types of foundation?
Which ratio use for cement selery???
all technical question
Who designed the city of washington dc?
Define the various stages of the project planning process in construction.
How to do bbs in excel format
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
what is tension column?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
How to arrive dry volume of concrete (1.52 to 1.57) ?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
Specific gravity of cement?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum