what is pt100 RTD, and does 100 stands for
Answer Posted / mhax papio
Pt100 means PT is platinum material used in the sensor of
the Resistance Temperature Detector.100 means the
resistance of the sensor is 100 ohms at 0 deg C
Is This Answer Correct ? | 33 Yes | 4 No |
Post New Answer View All Answers
i have been asked by QAFCO to appear for interview for thy post of Instrument Designer(INTOOLS)..i m engineering graduate with 5 years exp. in design engineering.Will this job profile suit me??i need all ur help n suggestions for thy same?
what is the working principal of pribe
what is the procedure of belt scale calibration?
What is stripper & spilitter ? Diffrence in this.?
what is the difference between attemperator and desuperheater ?
we are using centum vp as monitoring with Dell precision work station T3600 but some times PC(s) are restarted automatically . how we can solve this problem? thanks
I am using 971 Enraf radar level transmitter for LPG tanks ,the tank side indicator gives the error code 999999999FL can any body give me any diagnostic for this issue?
whats the abbreviation of IOP? is it instrument of power or input open problem?
1- Explain about HPM 2- What is the FSC and explain the configuration of FSC 3- explain the complete loop of vibration, how it works (field to control room) 4- What is the use of proxymitter? 5- During job your partner effected with H2S then what you have to do. 6- what type of gland packing uses when valve glind is leaking.
what different types of problems do occur while doing instrumentation commisioning and how to solve them? please explain in detail
what is easiest way to read STL language in PLC?
how to design orifice plate?what is the equation?
what is piezoelectric transducer?give an example in power plant n state its principle?
I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.
Hi i m B.E. In elect. & comm. I m workin in bio mass plant from 6 mnths as inst. Engg. but now i m in dept. Of operation as shift engg...which is best operation or inst. 4 me? M confusd..plz help and reply me..