WHY THE FREQUENCY IS 50 HZ IN INDIA.CAN WE USE SOME OTHER
FREQUENCY.IF SO WHAT IS THE RANGE AND WHAT WILL BE THE
EFFECT IN PRESENT POWER SYSTEM IF WE CHANGE THE FREQUENCY
AS YOU SUGGEST ?
Answer Posted / jyotsna singh
in india the electrical devices are constructed for 50 hz and 230 vlot so if the frequency is chanfed we hav to chanfe the rating of the devices accordingly and as the frequency is directly proportional to the number of poles,if we increase the frequency we have to increase the number of poles also so it is not feasible
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
1.what is mean by 8/20 micro sec waveshape
If we need 4c× 50mm sq cable but it's not available so we can pull 4c×25mm sq two cables?
Is it true that in the 3 phase transformer, the limbs of the core are at 45 dgrees to each other. if true, why?
what is the constructional difference between a power transformer and potentian transformer?
What was your role in the silicon evaluation/product ramp? What tools did you use?
tan delta equation test on alternators
WHAT IS SUBSTATION & ACCORDING TO VOLTAGE HT,EHT SUBSTATION EXPLAIN IT
How should i design a 1ph & 3 ph transformer. Kindly let meknow all steps and formulaes related to design from scratch.
salam&hi, i need to know about how can i calculate an enough current for the new building before i submit it to the suppliers
When we need up only in o/p 440v, so why we use directly in 11kva in input?
what is induction furnance? how many phase supply given io its coil for 15 or 20 ton furnance?
what are problems caused by the pdu in rack server
Define conversion efficiency of a power amplifier. What is its value for class c power amplifier?
Sir,In our company there are 3 caterpillar make(capacity:(1) 3.3KV,2.5MW(2)3.3KV,2.5MW & (3)3.3KV,1.9MW) & 1 deutz make (capacity:11KV,3.8MW)gas engines utilised,all are running in paralell. There are three transformer utilised,(1) 6.25MVA,3.3KV/22KV,Impedence voltage:6.7% used for two generator,both are 2.5MW(2)5.5MVA,3.3KV/22KV,Impedence voltage:7.2% used for one generator of 2.5MW & (3) 5.5MVA,11KV/22KV,Impedence voltage:7.8% used for one generator of 2.5MW.all generator breakers capacity of 1250Amps. Sir,I want the details of fault level calculation of generator,transformer individually & for whole system. If you require any information from me.feel free for contact me sir.pl.send the answer of my question as the earliest as possible.
if we look on phasor of the transformer vaoltage is 180 oppsite at primary and the secondary so to improve a power factor is secondary should kept negative to improve it primary side means is -.90 became +.90 at other side