Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In a Tap changing transformer where is the tap connected ,
is it connected in the primary side or it is connected in
secondary side

Answer Posted / suryaraj

Tapings are
connected to high
voltage winding
side, because of
low current. If we
connect tappings to
low voltage side,
sparks will produce
while tap changing
operation due to
high current. Not
depend on primary
or secondary.

Is This Answer Correct ?    39 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Is single load(eg: three phase motor) having all the components like positive,negative,zero sequence components during fault condition?

1840


How to calculate Air conditioning capacity for a telecom BTS shelter?

3519


Explain the advantages and disadvantages of hydropower plant?

1138


What is the minimum IR value of HT/ LT cable? Pls post separetely!!!!!

2455


How isolater function when installed inelectrical 440V wiring

2245


How PSV sizing being done

2337


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

2045


How do we calculate the Out put voltage of generator, after the excitation is being given?

1941


Why insulation level follows this order? transformer < bus bar < circuit breaker & Isolator < transmission line.

2147


what are the range of memory address in plc for L&T lx7 4A

2334


What is the difference between a verilog task and a verilog function?

1283


role of europe union in UK safety legistlation (electrical safety)

1772


Is it possible to measure the voltage of a battery from a single terminal?

1749


What is the Nyquist criterion regarding control systems?

1104


Why we use ups battery and dsdb battery in thermal power plant

2099