Answer Posted / nayan patel
WE MUST PROVIDE THE LAP AT THE HALF LENTH OF COLUMN. LENGHT
OF THE COLUMN IS EQUAL TO THE CLEAR DISTANCE BETWEEN TWO
ENDS
Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
can stub column take the load as main column
how to calculate the length diamond shaped striupps in column
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
What is the quantity of cement in mix m20 concrete?
How will be cutting in timber plate size 600*400 column size
List out some of the software program that can be useful for architect?
Water filter calculation formula
How many kilo-newtons equals 1000 kilogram?
How many cement sand ballast in cc 1:4:8 40mm
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
what is the price of a cubic meter of concrete on international market?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
Define What are the materials used in building a gravity dam?