Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is standard height of an energy meter from ground?

Answer Posted / muthuramalingam

it's should be minimum 1.75 mtr from ground level i thing so

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is charger supervision and control supervision?

2076


Why does an induction generator is preffered as compared to synchronous generator in especially a wind energy power production project?

2125


1. How many types of mangers? 2.How many types of capacitors? 3.pls tell me normally types alternator problems?

2337


According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor

1974


how  do you choose the cable size as per amps rating & the voltage drop for the same.

1782


Proviiding the Dedicated N earth and individual Body Earths ,Finally these all looped /Now my Question :- will it not harm in case of Transformer Fault current flows in Dediacted N Earthing to Looped Body Earthing.

2207


what is the power rating of CPU, CRT type moniter, LCD type moniter,scanner Approx.

2198


What types of question are done for diploma students in aptitude test

1647


What is size 00, 01, 1 etc., in HRC fuse types?

2383


Should power factor be low or high?

1178


How i can calculate current of cable according to ares?

1999


what is the meaning of osr in transformer.

2145


A system absorbs 100 k J of heat and the increase in its internal energy is 100 kJ; the work done is

1282


As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?

1767


CAN WE CALCULATE THE NEGATIVE SEQUENCE AND ZERO SEQUENCE REACTANCE OF A GENERATOR USING ONLY ITS RATED VOLTAGE, KW, PF AND SYNCHRONOUS REACTANCE??? IF YES, THEN HOW??

5637