how calculated 3 load upon application? I
mins 6308 bearing plz.give me answer

Answer Posted / karan

?

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

AFTER OVERHAULING KTA19G3 AND JUST ABOUT TO START ,BUT WE DIDNT FIX THE OIL SUMP AND TEST FOR -WATER LEAK FROM LINER O RING SIDE,THEN WE FILLED WATER AND FOUND WATER LEAK FROM INSIDE OF ENGINE -CAM FOLLOWER SIDE PLEASE GIVE ADVICE TO RECTIFY THE SAME

1416


how many types of jacks

2027


One unit of btu is how many joules?

632


What is the purpose of stern tube?

1659


In order to increase efficiency and reduce co emissions and other emissions, clear coal technologies are receiving major attention. What are these ?

641






Why gas containers are mostly cylindrical in shape?

554


how water evaporated in sea

1474


In which process fluid expands but does no work ?

631


Explain why re-heater is used in gas turbine

676


What is a machine shop?

650


What is meant by reflectivity?

679


What is the purpose of a de-superheater?

1675


What are the causes of main engine Turbo Charger blower side dirty?

1368


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1385


For conduction of heat, the instantaneous rate of heat flow is product of three factors. What are these ?

584