1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?
Answer Posted / k sivaprakasam
reading to latest drawinng and given BOQ, PLANNING AND
CALCULATING MATERIAL REQUIREMENT AND MAINLY WELL LABOUR
MANAGEMENT. TASK IN RIGHT WORK IN FIRST TIME (IT WILL BE DO
NOT REWORK)
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How you can turn off the display for dimension in CAD?
why we are using stub column..? is it possible to construct steel stub column..?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is min thickness,min grade of conc & age of PQC ?
is basic cost of the material includes tax?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
How do you measure water flowing through 300mm diameter pipes?
Define What are the materials used in building a gravity dam?
How many axes do cartesian coordinate system has?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
how to caluclate sienerge qty in construction in ap
Define a polyline?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
what do you know that m20,m25
Whats the meanig of ,'K' VALUE in the case of soil.....