What is the selection & Designing procedure for
DG/Transformer
Answer Posted / mahender sharma
Transformer & DG Selection is depend upon Area & Load.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
single phase power supply give to separate one steel coup with water, what reaction create
why wire sizes are 3/29 or 7/29 and why not wire sizes are 2/29 or 6/29?
why u r living from presentaly working.
which connection is safer series or parallel?usually which connection we prefer at home?
What is meant by coupling capacitor?
1) What are your personal strength? 2) What are your personal areas of improvement? 3) What are your expectations from from a particular job? 4) what are your carrier objectives?
1) why a dg set shows variation of power factor and load when synchronised with other dgs? 2)Why the load sharing is not become equal in all dgs?. 3)When a dg set will not run on auto start?
DG Earth Value?
i've iocl interview.. if you know the interview process please give me information..
what is th basic difference between a d latch time line and a d flip flop time line???
Can 4pole (3 phase+neautral )RCCB proper functioning in only 3 phase load (no neautral, no Earth) ?
What is the need of generator relay panel
how can we save enegry by using VFD for Resiprocating Air compressor which is having more unloading running hours
What are n circles?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)