Answer Posted / vamsi krishna
EVERY SYSTEM HAS ITS RESPONSE AS 1) TRANSIENT RESPONSE AND
2) STEADY STATE RESPONSE
TRANSIENT STATE IN A SYSTEM IS THAT WHICH OCCURS FOR A
MILLI SECONDS DURATION OF TIME. IT IS ACTUALLY OCCURENED
DUE TO DIFFERENT CAUSES AS
1) SUDDEN ENERGISING OF THE SYSTEM.
2) LOADING THE SYSTEM SUDDENLY.
3) WHEN SYSTEM IS TERMINATED WITH THE NON CHARACTERISTIC
IMPEADENCE....ETC
THE MAIN REASON FOR THE TRANSIENTS IS THE PRESENCE AND
EFFECT OF ENERGY STORAGE ELECMENTS IN THE SYSTEM.
THERE ARE A NUMEROUS WAYS OF SOLVING METHODS FOR TRANSIENT
STABILITY.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the cut-off rate?
what is the advantages of having in-built acvvvf (without seperate inverter in the control panel)in the drive system of elevators?
In how we connect watt meter for open & short circuit test of a single phase transformer.
Showing results for capital, machinery, stock,wages, carriage in words, salaries, factory rent, repairs, fuel and power, buildings, debtors, sales, purchases, creditors, return outwords, return inwords, drawings, discount allowed, discount receivable, office expenses, bills payable, bills receivable, cash in hand, cash at bank, office rent comes under debit or credit
I am designing new project sub station with 220 kV / 11 kV, 40 MVA capacity. This project have many recifier sets, which can generate 3rd harmonics. Now I have to select vector group of This transformer. To minimise 3rd harmonics, what care should I take in selection of Transformer Vecrtor group? If it is Y-Y with open Delta tertiary then what should be the rating & voltage of Tertiary Winding?
in control scheme dc logic wiring commonly using negative loop,what is the reason?if we use positive looping what will happen?
What are the advantages and disadvantages of open loop control system?
What is dynamo?How it works and what is the function of dynamo in a DG.
How to calculate fault level of 11 KV system
how to define tell me about self
What is knee point voltage?
sir i ve applied for hindustan petroleum and power grid india ltd..and the exams on feb 22.can you pls send model papers and tell how to prepare for those.i need to get into any of these for sure.....
what about electrical pannel.? What is meant by plc pannel.?
what is the criterion for selecting vector group of Transformers ? i mean how to decide vector group of Generator transformer, substation trasformer and transformer at consumer end
mccb service sittings be done?