who's take first position in process in the timing of new
installation flow transmitter and control vavle. give the
answer with logical trick.

Answer Posted / shashidhar

Flow transmitter....

Since we do use valve to control this transmission , control
valve come next.

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the difference between scaler and vector drive

1657


Speedtronic system .

1531


what is vibration a part of proceess variable? if vibration is a part variables then how we minimize the actual vibration on machine on load,? vision of instrumentation contrl plz ans me IPGDL interview question

1505


In power plant to measure vibration of a turbine we install sensors. Before install this sensor we have to set gap voltage. What is meant by gap voltage and its use?

1613


Explain the difference between mmwc and mmwg?

3501






What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.

1792


how pressure transmitter work, what is its principal to measure and how its generate signal. for pressure transmitterinstallation which precautions must be taken ??

1316


What inherent design and operating principles are included in a modern control system to use predictive maintenance practices to increase overall system reliability?

1603


Senior engineer's please help me, what is Loop Checking and Loop test? and write difference also? soon urgent

1606


what is temperature compensation?

4774


How works weighfeeders in cement industry? what is the working principle?

1516


What are different types of orifice plates? State their uses.

629


when a magnet is heated?

1519


Why do we have earthing cable in branch cable and shield in the same cable?

2145


In turbine, what does term CDP, NI, NH, HSSOC, means

2197