11/.433KV, 100KVA TRANSFORMER is supplied with .433KV AT
ITS PRIMARY. HOW MUCH KVA IT CAN SUPPLY
Answer Posted / s.arul
Dear sir,
transformer only changed the voltage & current
rating. so not changed the KVA.
KVA = KV * A
SO, PRIMARY SIDE
100 = 11 * A
A = 100/11 SO CURRENT = 9.09 AMPS
SECONDRY SIDE
100 = .433* A
A = 100/.433 SO CURRENT = 230.95 AMPS
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
I have 4 DG set with 1500KVA rating. system breakers are 11KV & alternator are 415 Volts. Between alternator & breaker one stepup transformer used. i want to Know what is max. resistance for body earthing & 415 & 11KV V Neuteal earthing. my fault current is 14 times for 2 sec.
clarify types of motor operated valves and advantages
why most of junction box vendors providing T5/T6 Temp class jb's for T3 area any special reason?
What are approaches to tackle sedimentation problem of reservoir?
dg started in plc mode and load taken later one battery terminal connection will be disconnected by loose connection what will happen for dg and shall we connect battery terminals while dg in load time?
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
What is the purpose of stablization resistor in high impedance bus bar protection
i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.
IN electrical field, WHAT ALL THINGS THE CUSTOMER WILL ASK WHILE ORDERING FOR LT PANEL (ALL TYPES OF LOW TENSION PANEL)
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
salam&hi, i need to know about how can i calculate an enough current for the new building before i submit it to the suppliers
Pl. give me checklist for installation & commissioning of machine tool.
If two Transformers are connected in parallel having impedance of 50KA in both transformers will the impedance increase or decrease after connecting transformers in parallel?
What is the source of dependent source ?
at which voltage level arcing ground is occurs ??????????