how to calculate rate analysis of M25 grade concrete
Answer Posted / k v arjuna rao
As per material availability the ratio's of Sand Aggregate
and Cement including admixers calcuted per cum by design
mix.
The quantites of these material is multiplied with existing
rates including Transportation charges we get the Material
cost per Cum.
Then Labour required per cum is calcuted as per CPWD
Standards and multiplied with local labour rates given by
State Govt SSR or CPWD SSR for that area. we get labour
Rate for 1 Cum.
Finally add hire charges of machinery used for mixing and
pumping and placing of concrte, Sunderies, water charges &
Overheads & Profit for contractor on Material rate & labour
rate.
finally we get Rate per Cum.
| Is This Answer Correct ? | 20 Yes | 8 No |
Post New Answer View All Answers
Can we apply curing compound on ceiling (slab Bottom)
What is the strength of cement?
Explain moment of inertia?
pls mail some more tecnical qustions at msaranya2610@gmail.com
I need old MMUP exam question and answer for Civil engineering
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
Test procedure of fly ash bricks as per code ?
Slab quantity
What are your future hopes for this job?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
What is the standard volume of pharma in cub ft
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
what is the name of shuttering oil used in oman