It is the point where the bending moment changes its sign i.e from positive to negative.
Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
What are the different methods for drawing an arc?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
detailed calculation of the amount of cement used?
What are the RISKS during the project construction?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
What is type failure of road surface? how to repair the failure of road surface?
What is meant by cad?
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
what is constat for brickwork
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
Explain major differences between routing maintenance and major maintenance.
Define the various stages of the project planning process in construction.
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
can you provide a link for manual design of building?
How many axes do cartesian coordinate system has?