sir how can we find the cement and sand required for making 4" drop
how many kg of 20mm, 10mm, dust available in one ton stone boulder
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
how to calculate testing date
How to calculate Volume of Wet cement concrete for a specific grade?
What is a projection line?
How to calculate chejja reinforcement
List out the potential risk factors for workers on the construction site?
what is relation between SPT N value and driving piles after conducting a soil test?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
how we calculate the grade of the Bituminous materials.?????
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?