What is language of Engineering?

Answer Posted / abdullah

drawing and estimating.............

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir how can we find the cement and sand required for making 4" drop

1651


how many kg of 20mm, 10mm, dust available in one ton stone boulder

1436


Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......

1738


how to calculate testing date

1237


How to calculate Volume of Wet cement concrete for a specific grade?

1778






What is a projection line?

715


How to calculate chejja reinforcement

1902


List out the potential risk factors for workers on the construction site?

652


what is relation between SPT N value and driving piles after conducting a soil test?

1589


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2105


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

1563


how we calculate the grade of the Bituminous materials.?????

1838


Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?

2602


show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water

1637


how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?

1992