Answer Posted / sikki
Accuracy,Quickly and Stability
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
how much used soil in 1 brick of standard size?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
what will be price of 1:2:4pcc per kg?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
What is the cemnent ratio
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
Types of column foundation and how to calculate its steel quantity.
Define What is passive earth pressure ?
how can we calculate steel value, depending on load
The largest size of paper used in plotter to print the drawing made by Autocad .
Prepare a Schedule for a Highrised building from starting stage to Handover?