In a 4 cycle engine the intake valve begins to open at?

Answer Posted / muhammad din

due to the rocker arm of cam and low internal pressure

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is critical pressure ?. What will happen if water is heated above critical pressure and temperature?. What importance it is having related to Boiler?. Upto what presrure natural circulation is possible in Boilers?.

2051


how to design a crankshaft?

1791


if the blade height is increased,then how it increases the specific speed of centrifugal pump?

3070


What causes damage to impellers?

1404


Gegger is used in foundry for the purpose of____________

1714






How do motion detectors work?

717


What is the different between brass and bronze ?

685


i m a 1st year student my senior asks me 2 give intro wht will a impressive answer

1788


Which factors influence the type of fracture in failure of a material ?

614


IN AC mechanical fuelpump what stands for AC? IN SU mechanical fuelpump what stands for su?

2837


How cavitation can be eliminated in a pump?

656


What is vane diagram in centrifugal pump?

1800


What minerals are used in the manufacture of cars?

612


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1387


If the black box flight recorder is never damaged during a plane crash, why not the whole airplane made out of that stuff?

709