what is periode of deshuttering for different area of slab

Answer Posted / harbans singh

It is also depends on whether in cold deshuttering required
more time.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How you can turn off the display for dimension in CAD?

636


how to calculate mivan shuttering matrial

966


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2262


How much is the cover for slab?

736


What is thumb rule in quality and quantity estimation of a Residential building??

1212






roll of DLC in road constructions

1411


what is castigliano theaorem

1833


percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters

1644


i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

1415


insted of bentonite we can use any alternate material in piling ?

1704


I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs

2060


Describe the various methods of concrete curing?

682


1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.

7573


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10212


what is the function of GSB all class ?

679