how many binding wire can be required for 1 metric tonne
steel?
Answer Posted / sanjeev
5-6KGS
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is the strength of 1:6:12 mix?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
please send me bhel questions on rupesh.017@rediffmail.com
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
What out turn civil works
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
what is kribs is supporting?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
detailed calculation of the amount of cement used?
Differentiate orthographic and isometric projections?
why we can use dust in concrete insted of fly ash