beam top main reinforcement(25mm) was drilled off by
mistakely when making drill hole for dummy columns. any one
can give useful information for this issue or related code
or websites.
Answer Posted / suresh baria
Remove the top covering of beam, Observe the laying of top
reinforcement then drill the hole of required dia berween
the top reinforcementof beam for the errection of
reinforcement of dummy columns.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Describe the various methods of concrete curing?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
How to do base isolation using ETABS software?
Explain the advantages and disadvantages of using plastic and timber fenders?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
Can we apply curing compound on ceiling (slab Bottom)
What is the force exerted by the tacoma narrows bridge?
why is the column design?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
How to do rate analysis for concrete work including shuttering work?
Explain the water bound macadam roag
Which purpose we use deck anchor in bridges?
what are the proper pipes for salt water line
What are the advantages of cad?