beam top main reinforcement(25mm) was drilled off by
mistakely when making drill hole for dummy columns. any one
can give useful information for this issue or related code
or websites.

Answer Posted / suresh baria

Remove the top covering of beam, Observe the laying of top
reinforcement then drill the hole of required dia berween
the top reinforcementof beam for the errection of
reinforcement of dummy columns.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

1831


how to calculate steel for slab or footings?

1195


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

1950


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

1663


Why is concrete cube test carried out?

776






how many tonnes equals to one cubic feet?

1195


length where bent up is made in slab of bridge from one end

1450


How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

1448


what is the hanekom repairing material after concreting work

1925


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1674


what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????

1482


What is need for setting limits?

656


what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????

1662


Explain what is Hybrid Foundation?

746


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

1734