Please can anybody let me know how to calculate cement,
sand & aggregete content for one meter cube of concrete.
please if possible provide calculations for cement in no.
of bags, sand & aggregate in cu.mt.
Thanks.

Answer Posted / md umar

first of all any concrete mix design should be grade design
not define here .suppose ratio of concrete 1:1:2 (M25)for
calculate cement sand cource agregate .15.2/1+1+2 for 10m3
calculation of cement 15.2/1+1+2
15.2/4 or 0.37 cum
sand 0.37
cource aggragate 0.37*2 0.70 com

Is This Answer Correct ?    14 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

4548


give me the rate analysis for Bituminous Macadam and SDBC

6938


strength vs shape factor

2127


Explain what is alternate bid?

786


Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete

2009






how many litres of enamel paint required for 5000 sft of site?? 

1478


How many days should curing of plastering, brick work and concrete

1207


how much percent are used 20mm,10mm?

1437


what are the duties of Site Engineer in work site?

1158


What are the methods of measurement? Describe it shortly

1779


How high should the water tank be to provide a 60 psi at base of this water tower?

672


i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

1484


In block work seawalls what is the purpose of slip joints?

752


how to calculate MR 9(derivation)

2311


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

2035