Answer Posted /
| Is This Answer Correct ? | Yes | No |
Post New Answer View All Answers
What do you mean by append?
What are the rules in creating php variable?
What is the transport and message reliability?
What are the types of methodology?
What are dynamic attributes and their handler?
Hello sir! I hav read the above discussions about PSU.I hav 72% aggregate in Mechanical bt i do had a back in 1 subject,so m i too eligible for PSU?
What is user properties?
Why does this code crash?
What is a php object?
Explain a heavy weight process?
What is the difference between the usage of an id and a class?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
what is msmq binding? : Wcf data services
What Are The Advantages Of Derivatives?
What is the use of system.windows.media namespace?