how to caculate cable size for given amperes

Answer Posted / anilkumar

As per standred there is no formula, its only depend on
cable manufacture cataloge and we following same as what
amarnath said AL cable current carrying 1A per SQMM and
copper cable carring 4A per SQMM.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18

1645


what is the difference between c power and U power acb breaker

5270


I am applying for NTPC examination.Can we please provide previous paper to my mail prasad.chintala108340@gmail.com

1728


How to set a Zone 1 distance relay for distribution feeder?

1530


What is acsr cable and where we use it?

706






What is the use of oil in transformers?

622


What if high voltage side circuit breaker of a ehv transformer instead of lvcb? Kindly elaborate.

1317


How to calculate the multiplying factor for energy meter with ct ratio given

1535


Write down the design procedure of commutaj.

1724


In a power conditoining unit (inverter) of a solar plant when we measure the d.c. current fed by different strings of solar plates to inverter, the current in the negative wire is less almost by 1 ampere to the current in its positive wire say current in positive wire 5 A , then current in negative wire of the same string is 4 A. Since the current entering should be equal to current leaving then why the current is noticably less in negative wire.

1124


what is the difference between transformer,converter and transducer

1151


mccb service sittings be done?

1420


is it true there's a big difference in using Cummins or Denyo...especially power output or leakage

1390


sir iam from electrical and electronics branch ,can i appear for the hpcl offline requirtment? if yes please mail me on vikram_raju25@yahoo.co.in

1543


typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?

1290