What is the difference between M20 and M25 concrete?
Answer Posted / mathi.v
M20 compressive Stregth is 20N/mm2
M25 compressive Stregth is 25 N/mm2.., this r 21 days
| Is This Answer Correct ? | 3 Yes | 17 No |
Post New Answer View All Answers
Explain what are the problems one might face while having a Cantilever balcony?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
what is mean by reestimation?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
what is called Bulk Density of aggregate?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Aptitude, reasoning, quants, verbal and technical question
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
why we are useing plastic under the lean concrete?and whts the advantage?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
Define polar co ordinates.