what is the weight of concrete for 1 cum?

Answer Posted / anshul jain

2.5 tonne i.e 2500kg

Is This Answer Correct ?    7 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

1505


I want to join bhel because

1773


How do you determine specific gravity of cement?

698


Rate analysis of 150mm, 100mm, & 230mm thk BBM work

7885


WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?

1783






To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?

1500


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

2393


I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent

1782


What is the strength of 1:6:12 mix?

2597


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

3538


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1277


what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

1875


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3329


Explain the different types of building contracts?

660


Any strength is a stress but any stress is not strength

1280